Design and construction of a covered sludge storage yard, with lateral protection on the northern perimeter consisting of a grille wall that allows ventilation of the area. Combined with periodic sludge turning, this provides the efficiency conditions required for water evaporation and the subsequent drying of the sludge to the desired levels.