Removal of 1,131.0 m² of cobblestone paving, demolition and removal of kerbs, gully pots and asphalt. Excavation and removal of 1,268.0 m² of unbound aggregate (tout-venant), placement of 1,268.0 m³ of sand. Construction of timber structures (stakes / footbridges / decks / boardwalks / decking). Installation of urban furniture, kerb laying, construction of 1,100.0 m² of cobblestone paving and 105.0 m² of Terraway resin-bound paving. Planting and lighting network.