Construction of Phase B of the Landfill Supporting the Coimbra MBT Plant

Fotos

Info

Construction of 2 cells in the landfill; clearing (37,855 m²); excavation (149,217 m³); embankment works (48,864 m³); clay placement (31,071 m³); geocomposite (66,103 m²); liners (66,067 m²); drainage networks; electrical installations and lighting; asphalt pavements (10,800 m²); fire-fighting network; leachate pond.