The “General Construction and Infrastructure Contract in Sobreiras Altas, Grândola” covers Phase 1 of the project, with the construction of the development’s infrastructure.
The contract includes the following works:
- Site setup
- Landscape architecture
- Road infrastructure
- Electrical installation infrastructure
- Telecommunications infrastructure (ITUR)
- Water supply infrastructure
- Drainage infrastructure
- Foundations and structures