Demolition of pavements, kerbs, fences and general site clearing (6,555 m²); excavation (35,820 m³); embankment works (2,687 m³); cobblestone paving (2,840 m²); kerbs; gabion wall construction (13,518 m³); asphalt paving (2,577 m²); planting; irrigation network construction; drainage network.