oliveiras
Projeto

Construction of the Milfontes Reservoir

Fotos

Info

Excavation and embankment works, installation of PVC geodrain, geotextile / HDPE geomembrane, and asphalt paving. Reinforced concrete structures: access pontoon over the channel, inlet structure, water intakes, construction of connection chambers and Ø 900 HDPE pipe. Control room including reinforced concrete, metalwork, electrical installations and automation.