Excavation works, Ø 0.80 m piles, reinforced concrete, steel structure, installation of precast concrete slabs, gabion walls, hydroseeding, coloured asphalt, Corten steel guard rails, granite cube paving, urban furniture, stormwater drainage network and electrical installations.