Transfer station: Stripping (1,878 m²); Excavation (1,809 m³); Fill (6,317 m³); Reinforced concrete structures (740 m³); Metal structures; Monos platform: Stripping (1,347 m²); Excavation (302 m³); Fill (512 m³); Reinforced concrete structures (550 m³); Paintwork; Road network: Concrete slabs (1,100 m²); Signaling equipment; Potable water network; Compressed air network; Fire-fighting network; Stormwater drainage network; Wastewater network; Electrical equipment installations; Safety signage.