Preparation of the study of the permanent and transient hydraulic regime in the supply system between the Asseiceira Water Treatment Plant and the Alcanhões reservoir resulting from the installation of the plant; execution and sizing of a protective solution for the supply system; manufacturing, factory testing, supply of equipment, including transportation, loading and unloading, installation, commissioning, and supervision during execution, testing, and commissioning of the turbine and generator, as well as the other associated electrical and mechanical equipment, such as supply and return pipes, valves and line fittings, load lifting equipment (overhead crane, hoist or load beam, or other lifting equipment, depending on the proposed solution), power and auxiliary service electrical panels, transformer, medium voltage switchgear, control and instrumentation systems, auxiliary systems (ventilation, intrusion and fire detection, etc.) and supply of spare parts; construction of the plant building, foundations, chambers, reservoirs, access points, and fencing; carrying out necessary works during the commissioning period of the installation, lasting 60 days; provision of maintenance services for a period of 3 years.