Removal of kerbs, trees and asphalt pavements (1,930 m²), demolition of existing structures, dismantling and relocation of structures. Construction of Ø 1,000 reinforced concrete piles (97 lm), structural rehabilitation of reinforced concrete structures and waterproofing. Installation of fibre-reinforced plastic (FRP) structures, walkways and channels, construction of new reinforced concrete components, roofing, metalwork and indoor water circuits. Installation of electrical and electromechanical equipment, external landscaping (fencing, metal guard rails, asphalt paving — 1,970 m²).