Construction Contract for the Water Supply Subsystem of Benavente / Vale Tripeiro / Samora Correia

Fotos

Info

Construction of the Benavente Supply Main — 5,365.0 lm of ductile iron (DI) pipes, DN 200, 225 and 250; 118 manhole units and 83 lm of horizontal drilling crossings. Construction of the Samora Correia Supply Main — 7,400.0 lm of DI pipes, DN 200, 250 and 300; 4,050.0 lm of HDPE pipes, DN 200 and 250; 242 manhole units.

Construction of the Vale Tripeiro balancing reservoir: 2,700.0 m³ of excavation and transport, 1,300 m³ of reinforced concrete and masonry finishes. Installation of electrical, electromechanical and instrumentation equipment.

Refurbishment of the Piscinas, Lavadouros, Areias, Vale Tripeiro, Murteira Industrial Zone, Samora Correia and Porto Alto reservoirs, and of the Coutada Velha delivery point.